
More and more projects pursue LEED or similar certification, and the concrete record becomes part of the evidence. We do not certify buildings. Our practices are the controls that make certification achievable and contribute directly to it.
| Item | Recommended control | Standard |
|---|---|---|
| Fresh concrete temperature | Measure and record every delivery, or as specified | EN 12350 · ASTM C1064 |
| Maximum delivery temperature | 35 °C if ACI 301 governs, unless an approved exception applies; otherwise per project specification | ACI 301 · ACI 305R |
| Compressive strength | EN 12390 testing according to the approved inspection plan | EN 12390-3 · EN 206 |
| Curing | Document curing methods and duration | EN 13670 |
| Thermal cracking | Monitor temperatures where the thermal-control plan requires | Thermocouples · ACI 207 |
| Crack width | Verify against structural design and project specifications | Eurocode 2 (EN 1992-1-1) |
| Mix design | Maintain approved mix designs and supporting documentation | EN 206 |
| Concrete EPD | Obtain verified EPDs where required for the selected LEED credits | EN 15804 · ISO 14025 |
| Repair procedures | Obtain engineer approval and document repairs | EN 1504 |
We work to the Eurocodes and EN standards adopted in Cyprus, and to ACI 301, 305 and 318 where the project specification calls for them.
Agreed with the engineer before the first pour.
Temperatures, slump and cube results, per load.
Handed to the consultant for the certification file.
A delivery note tells you what was ordered. Tests tell you what arrived and how it performs. Read why we test every concrete mix and what EN 206 in 2026 means for ready-mix concrete in Cyprus.


CONCREX provides concrete quality control for projects across Cyprus: an inspection and test plan agreed with the engineer, fresh concrete checks on every delivery (temperature, slump) to EN 12350, compressive strength testing to EN 12390, curing records to EN 13670 and written results for the project file. Call 7000 1175.
No. LEED certification is awarded to the building through its own process. Our testing, curing and thermal records are the controls that make the concrete part of that evidence achievable.
Fresh concrete temperature and slump on delivery, cube or cylinder sampling for compressive strength to EN 12390, and, where required, temperature monitoring with thermocouples.
Yes. We agree the inspection and test plan with the engineer before the first pour and report against it.
Yes. Embedded thermocouples log core and surface temperatures so the temperature difference can be kept within the limits of the thermal-control plan.
Tell us about your project and we will visit, measure and send a clear written quote.